logo
968 Sonuçlar

"asme steam economizer"

Kalite Kazan Sistemi Uygulaması için Karbon Çelik HFRW Fin Borulu Kazan Eşanjörü fabrika

Kazan Sistemi Uygulaması için Karbon Çelik HFRW Fin Borulu Kazan Eşanjörü

Carbon Steel HFRW Fin Tube Boiler Heat Exchanger for Boiler System Application Introduction Finned tube is mainly used for boiler economizer, air preheater, heat recovery, petrochemical,industry cracking furnace and etc.It can largely save energy and protect environment.Our company can produce finned tube from Φ22mm to Φ250mm according to GB, ASME, or as per requirement of the customers. According to the wing shape and structure, finned tube can be divided into the following

Kalite ISO9001 Kompakt Tırtıklı Eşanjör Bakır Fin Borusu Kazan Fin Borusu fabrika

ISO9001 Kompakt Tırtıklı Eşanjör Bakır Fin Borusu Kazan Fin Borusu

High Efficiency Boiler Fin Tube H Type Spiral Fin Tube For Heat Exchanger H-fin Tubes have two steel discs,with fluorescent tubes symmetrically welded together to form fins(fins of butterfly piece)creating a shape that looks somewhat like the letter"H",creating an efficient energy saving, extension heating surface.H-fin Tubes also have a high rate of fusion welds and weld tensile strength.H-fin Tube is assembled with the H economizer, which has high efficiency,little

Kalite Isı Geri Kazanımı İçin U Bükümlü Endüstriyel SA210 Kazan Spiral Fin Borusu fabrika

Isı Geri Kazanımı İçin U Bükümlü Endüstriyel SA210 Kazan Spiral Fin Borusu

GB Standard SA 210 GR.A1 Boiler Spiral Fin Tube with U Bends for Various Industrial Boilers Appllication General introduction Spiral finned tubes are widely used in heat recovery of boiler economizer, air preheater, and waste heat boiler, as well as heat exchange equipment in chemical industry, pressure vessel and other fields. The capacity of units used in boilers has also increased from small to large, and their applications are increasing day by day. At present, many

Kalite Isı Değişimi İçin Yüksek Verimli Endüstriyel Kazan Fin Borusu Spiral Paslanmaz Çelik fabrika

Isı Değişimi İçin Yüksek Verimli Endüstriyel Kazan Fin Borusu Spiral Paslanmaz Çelik

High Efficiency Industrial Stainless Steel Boiler Spiral Fin Tube For Heat Exchange General introduction At present, spiral finned steel tubes are mostly winding, high frequency welding and brazing spiral finned steel tubes. The intergal spiral finned steel tubes have become t renewal product of the above three types of spiral finned steel tubes because of its long service life, stable heat transfer performance and obvious every saving effect. Their advantages are shown in

Kalite Boiler Su Duvarı Uygulamaları için Yüksek Basınçlı Özel Alaşımlı Çelik Su Duvarı Paneli fabrika

Boiler Su Duvarı Uygulamaları için Yüksek Basınçlı Özel Alaşımlı Çelik Su Duvarı Paneli

Endüstriyel enerji santralleri için yüksek basınçlı buhar kazanı su duvarı panelleri. Özel alaşımlı/karbon çelik yapı, ISO/ASME sertifikalı. Isı emilimini artırır, koklaşmayı azaltır ve fırın duvarlarının sızdırmaz olmasını sağlar. Tam kalite kontrolü ile 38 yılı aşkın üretim uzmanlığı.

Kalite Yüksek basınçlı özel özellikler, elektrik santrali kazanları için alaşımlı çelik zarı su duvar paneli fabrika

Yüksek basınçlı özel özellikler, elektrik santrali kazanları için alaşımlı çelik zarı su duvar paneli

Elektrik santralleri ve endüstriyel kazanlar için yüksek verimli membranlı su duvarı panelleri. Özel alaşımlı/karbon çelik yapı, ISO/ASME sertifikalı. Isı emilimini artırır, koklaşmayı önler, fırın duvarlarının sızdırmaz olmasını sağlar. Tam kalite kontrolü ile 38 yılı aşkın üretim uzmanlığı.

Kalite Santral İçin Yüksek Verimli Endüstriyel Sirkülasyonlu Akışkan Yataklı Kazan fabrika

Santral İçin Yüksek Verimli Endüstriyel Sirkülasyonlu Akışkan Yataklı Kazan

High Efficiency Circulating Fluidized Bed Boiler for Power Station Product Description HD circulating fluidized bed boiler is energy saving which is mainly installed at power plants to generate electricity. HD CFB boiler adopts stationary equipment design theory and CFB boiler technical parameter Structure Features Natural circulation water-tube boiler single boiler barrel, an n-shaped structure. The hearth is membrane water wall hanging closed structure. Adopting the water

Kalite Yanma Sirkülasyonlu Akışkan Yataklı Kömür Yakıtlı Enerji Santrali Kazanı Yüksek Verimlilik fabrika

Yanma Sirkülasyonlu Akışkan Yataklı Kömür Yakıtlı Enerji Santrali Kazanı Yüksek Verimlilik

Energy Saving Coal Fired CFB Boiler and Utility Boiler with Grade A certification Product Description HD circulating fluidized bed boiler is energy saving which is mainly installed at power plants to generate electricity. HD CFB boiler adopts stationary equipment design theory and CFB boiler technical parameter. Circulating fluidized bed is of low-temperature combustion, therefore, nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and

Kalite Yüksek Mukavemetli Kazan Fin Borusu Entegre Ekstrüde Spiral Fin Borusu Dirençli Korozyon fabrika

Yüksek Mukavemetli Kazan Fin Borusu Entegre Ekstrüde Spiral Fin Borusu Dirençli Korozyon

Integrated extruded spring tube resistant corrosion new technology less dust high strength boiler fin tube Product Description 1.The integrated spiral fin tube economizer is a newly type heat transfer equipment, consisting of spiral fin tubes to overcome the serious abrasion and short service time. 2.The integrated spring tube consisted of series of spiral finned tubes, the headers of inlet and outlet, bend, frame and other auxiliaries 3.Structure arrangement: in line

Kalite Otik Placode İzolasyon Kazanı Su Duvarları 12Cr1MOVG / 15CrMOVG fabrika

Otik Placode İzolasyon Kazanı Su Duvarları 12Cr1MOVG / 15CrMOVG

Otic placode isolation 12Cr1MOVG and 15CrMOVG for heat treatment process Description 1.Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between. 2.These walls form the enclosure of the coal combustion chamber. 3.Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler. Challenges 1.As the water wall tubes form a

Kalite Santral Kazan Manifoldu Başlıkları, Paslanmaz Çelik Kazan Parçaları fabrika

Santral Kazan Manifoldu Başlıkları, Paslanmaz Çelik Kazan Parçaları

Product Description In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production. When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially

Kalite Isı Değişim Santrali Kazan Manifoldu Başlıkları Yüksek Verimli Enerji Tasarrufu fabrika

Isı Değişim Santrali Kazan Manifoldu Başlıkları Yüksek Verimli Enerji Tasarrufu

Heat Exchange Power Plant Boiler Manifold Headers High Efficient Energy Saving Product Description In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production. When making hinders of the style, we adopt advanced